Oakway fitted out ICS Cool Energy’s Birmingham depot with bespoke pallet racking and specialist power supplies to test cooling equipment before dispatch.

  • Bespoke racking for varied pallet sizes
  • Dedicated power for pre-dispatch testing
  • Aisle lighting planned for future expansion
  • One point of contact for the fit-out
ICS cooling racking

The challenge

With existing depots in Southampton and Leeds, ICS Cool Energy needed a central Midlands base in Birmingham to support its cooling equipment hire and servicing operations.

ICS needed assistance designing racking for its complex range of products, which varied in pallet type, height and size. It also required specialist power supplies throughout the warehouse to test equipment before dispatch as part of its quality-control process.

With the depot manager already overseeing the other two sites, the client wanted a single point of contact to coordinate the fit-out.

ICS Cooling Racking

The solution

Oakway visited ICS’s existing site in Hampshire to catalogue product dimensions and developed a CAD layout with pallet racking designed around its equipment. Every racking level was timber-decked to accommodate the different pallet sizes, with heavy-duty upright protection installed to help guard against impact damage.

Specialist electrical supplies, including armoured cabling and a range of industrial Commando sockets, were installed throughout the warehouse to enable equipment testing before dispatch.

Warehouse lighting was positioned directly above the racking aisles, with provision for an additional run of racking as storage requirements grew. Oakway also installed workbenches with data connections and dedicated task lighting, alongside fire alarm works to complete the fit-out.

The outcome

The Birmingham depot gave ICS a central base to serve customers across the Midlands, enabling faster responses to local cooling hire requirements. The bespoke racking supported a larger and more varied stockholding, with storage tailored to the different heights and pallet sizes of its equipment.

The specialist power installation allows each unit to be tested before it leaves the warehouse, supporting ICS’s quality-control process. The lighting layout provides flexibility to add another run of racking as storage requirements increase.

The relationship with Oakway extends beyond the initial fit-out, giving ICS a single point of contact for ongoing maintenance and support across its lighting, electrical systems and fire alarm.

Discuss your warehouse project

In their words

Alvin and his team helped us through the pros and cons of the various options and visited us on site to refine our thinking and to ascertain which system would best suite the needs of the Lecico business.

We elected to install semi-automated high density racking using a pallet shuttle system … due to the use of the shuttle system meaning that every space could be utilised, we have in truth increased our useable storage capacity by 20-30%.

Alvin and his Pointer Group colleagues worked with us throughout the planning and design stage and continued to support us through the installation and finally the sign-off phases. As a result, we have a far more modern and safer warehouse that optimises our space.
John Brooks Supply Chain & Operations Director, Lecico Bathrooms

Proudly working with

At Oakway Storage, we are always ready to talk about your storage requirements. Our specialist team can provide expert advice for your specific needs – give us a call today or fill in the form for a no-obligation chat

Call us on 01604 792255

or request a callback using the form.
You can also email us on: info@oakwaystorage.co.uk

Business Hours: 8am-5pm

Close Menu